Cabinet Measuring
Document walls, openings, ceiling height, appliances, utilities, and obstructions before the cabinet layout is prepared.
Open cabinet guideProject planning resources
Start with the cabinet, tile, and flooring measurements that shape an accurate plan. Use the guides below to document the room clearly, then bring the information into assisted design or your next project conversation.
Final field dimensions, site conditions, product fit, and quantities must be verified before an order is released.
Follow the downloadable cabinet guide while you record each wall, opening, utility, appliance, and unusual site condition.
How to measure a kitchen
The goal is not a perfect design on the first sketch. It is a complete, legible record of the walls, openings, utilities, appliances, and conditions that affect the cabinet plan.
Choose the right guide
Cabinets depend on walls, openings, appliances, and utilities. Tile and flooring depend on surface area, layout, transitions, cuts, and the installation plan. Keep each set of measurements distinct.
Document walls, openings, ceiling height, appliances, utilities, and obstructions before the cabinet layout is prepared.
Open cabinet guideRecord the surfaces to be covered, openings and exclusions, planned layout, and installation details before calculating material.
Open tile guideMeasure each connected area, note irregular spaces and transitions, and keep product-specific layout and installation needs in the plan.
Open flooring guideBefore you submit
They should be careful and complete enough to begin planning, but they are not a substitute for final field verification. Mark any measurement you are unsure about so it can be reviewed before release.
Photograph every wall from straight on when possible, then add close views of openings, utilities, soffits, vents, unusual corners, and any condition that could affect product placement or installation.
Share the appliance type and the size range you are considering. The final model or verified finished dimensions and required clearances must be confirmed before the cabinet order is approved.
Submit the project through assisted design and the team will confirm what information is needed for the planning process. Responsibility for final field verification and written order approval will be confirmed before release.
The next step
Use assisted cabinet design when you are ready to share the measurements, photos, appliance information, openings, ceiling height, and project goals you have collected.